We Are Currently Executing the Supply, Installation, Testing, And Commissioning (SITC) Of 66 kV Single-Circuit (S/C) And Double-Circuit (D/C) Transmission Lines on Double-Circuit Towers. The Project Includes Stringing Eco Panther Conductors and Installing OPGW From the GETCO Substation to The 90 MW Pooling Substation at Kamlapur.
All Works Are Being Carried Out with Strict Adherence to Safety Protocols, Approved Drawings, And Utility Standards, Ensuring Minimal Disruption to the Existing Network. The Project Involves Tower Erection, Conductor Stringing, And High-Voltage Terminations, Executed Efficiently By Our Skilled Team.
Upon Completion, The Transmission Lines Will Provide a Reliable Power Evacuation Link, Supporting Seamless Integration of Renewable Energy into The Grid. This Active Project Highlights Our Expertise in High-Voltage Transmission Infrastructure and EPC Execution.