The Project Involved the Supply, Installation, Testing, and Commissioning (SITC) of a 220KV Overhead Transmission Line for Evacuation of Power from the 368.5 MW ABREL project. Key challenges Included Execution Across Long Transmission Corridors, Management of Right-of-Way (ROW) Constraints, and Ensuring Compliance with Extra-High Voltage Safety, Quality, and Statutory Requirements. Maintaining Construction Quality, Coordinating Multiple Work Fronts, and Achieving Timely Grid Connectivity were Critical to the Project’s Success.