The Project Involved the Erection of A 66KV Line-In-Line-Out (LILO) Connection from The Existing 66KV Thasra-Rakhiyal Line to the 220KV Sevaliya Substation For LVTPL. Key Challenges Included Executing the LILO Work Without Disrupting the Existing Power Supply, Maintaining Adequate Safety Clearances, And Coordinating with Utility Authorities to Integrate the New Connection into The Existing Transmission Network Efficiently.