Erection of 66KV LILO to 220KV Sevaliya Substation from Existing 66KV Thasra-Rakhiyal Line for LVTPL

GETCO

Client name

2 Cr

Project Value

Vadodara, Gujarat

Location

The Project Involved the Erection of A 66KV Line-In-Line-Out (LILO) Connection from The Existing 66KV Thasra-Rakhiyal Line to the 220KV Sevaliya Substation For LVTPL. Key Challenges Included Executing the LILO Work Without Disrupting the Existing Power Supply, Maintaining Adequate Safety Clearances, And Coordinating with Utility Authorities to Integrate the New Connection into The Existing Transmission Network Efficiently.

A Structured EPC Execution Approach Was Adopted, Covering Detailed Route Survey, Foundation Works, Tower Erection, Conductor Stringing, And Termination for The LILO Connection. All Works Were Performed in Accordance with Approved Drawings, Utility Specifications, And Safety Standards, With Careful Coordination to Ensure Seamless Integration of The New LILO Link into The Existing 66KV Line.

The 66KV LILO Connection Was Successfully Erected and Commissioned, Enabling Reliable Evacuation of Power to the 220KV Sevaliya Substation. The Project Was Completed Safely, On Schedule, And in Full Compliance with Technical and Statutory Requirements, Enhancing Operational Reliability and Grid Connectivity For LVTPL.

Supporting India's Sustainable Energy Transition

With over a decade of experience, we understand the dual challenge of increasing power access while decreasing emissions. Our expertise in Solar EPC combined with modern T&D infrastructure upgrades means we are strategically positioned to facilitate India’s ambitious commitment to a net-zero future.