We Are Currently Executing the SITC Of A 66KV Single-Circuit (S/C) Overhead Transmission Line Of 4.7 Km on Double-Circuit (DC) Towers from the 220/66KV Faredi GETCO Substation to the 70 MW Solar Power Pooling Substation at Faredi, Gujarat.

The Scope Includes Tower Erection, Conductor Stringing, Cable Terminations, And Integration with The Substation, All Executed with Strict Adherence To Approved Drawings, Utility Standards, And Safety Protocols. Our Team Is Also Coordinating Site Activities, Material Handling, And Statutory Approvals to Ensure Seamless Progress.

Once Completed, The Transmission Line Will Provide a Reliable Power Evacuation Link, Enabling Efficient Integration of Solar-Generated Power into The Grid. This Active Project Highlights Our Capability in High-Voltage Transmission Line Execution and EPC Delivery for Renewable Energy Projects.